{"id":6276,"date":"2017-01-21T19:29:47","date_gmt":"2017-01-21T17:29:47","guid":{"rendered":"https:\/\/hiwerk.site\/sponec\/wooden-houses\/kashta-viena\/"},"modified":"2023-03-10T16:37:35","modified_gmt":"2023-03-10T14:37:35","slug":"house-in-vienna","status":"publish","type":"page","link":"https:\/\/hiwerk.site\/sponec\/en\/wooden-houses\/house-in-vienna\/","title":{"rendered":"Wooden house in Vienna"},"content":{"rendered":"<section class=\"wpb-content-wrapper\">[vc_row][vc_column][vc_column_text]\n<h1>Wooden house in Vienna<\/h1>\n[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/3&#8243;][vc_column_text]\n<p style=\"font-size: 20px;\">The wooden house in Vienna is one of our most difficult completed projects, but also one of the most satisfying as a final result. The terrain of the site had a huge vertical drop, without the possibility for access of equipment and therefore all the work such as removal of materials, lifting and placement was done manually.<\/p>\n[\/vc_column_text][\/vc_column][vc_column width=&#8221;2\/3&#8243;][layerslider_vc id=&#8221;6&#8243;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<img  class=\"x-img\"  src=\"https:\/\/hiwerk.site\/sponec\/wp-content\/uploads\/2014\/12\/\u0432\u044a\u043d\u0448\u043d\u0430-\u043c\u0430\u0437\u0438\u043b\u043a\u0430.jpg\" alt=\"vienna house\">[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text]\n<h5>Basic construction and finishing works<\/h5>\n<p>Our work on the Vienna house included the overall construction, including the finishing works. We managed within 4 months to do everything that was required of us, achieving a very good result and leaving satisfied customers.<\/p>\n<p>The house consists of two floors, and on the first floor are located: a living room, a kitchen, a study and a bathroom with a toilet. On the second floor there are three bedrooms, a wardrobe room, as well as two bathrooms with a toilet.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243; el_class=&#8221;vc_col-sm-push-6&#8243;][vc_column_text]<img  class=\"x-img\"  src=\"https:\/\/hiwerk.site\/sponec\/wp-content\/uploads\/2014\/12\/\u0434\u044a\u0440\u0432\u0435\u043d\u0438-\u043e\u0441\u043d\u043e\u0432\u0438.jpg\" alt=\"low energy house\">[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243; el_class=&#8221;vc_col-sm-pull-6&#8243;][vc_column_text]\n<h5>Project Information:<\/h5>\n<ul>\n<li>Total floorage: 234 m2<\/li>\n<li>1st floor: a living room, a study, a kitchen, a bathroom with a toilet;<\/li>\n<li>2nd floor: 3 bedrooms, wardrobe, 2 bathrooms with a toilet.<\/li>\n<li>Construction technology of the external walls: Eco 2<\/li>\n<li>Year of construction: 2015<\/li>\n<li>Construction period: 4 months<\/li>\n<\/ul>\n[\/vc_column_text][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row_content_no_spaces&#8221;][vc_column][vc_column_text]<hr  class=\"x-gap\" style=\"margin: 20px 0 0 0;\"><div  class=\"x-entry-share\" ><p>Share this project<\/p><div class=\"x-share-options\"><a href=\"#share\" data-x-element=\"extra\" data-x-params=\"{&quot;type&quot;:&quot;tooltip&quot;,&quot;trigger&quot;:&quot;hover&quot;,&quot;placement&quot;:&quot;bottom&quot;,&quot;title&quot;:&quot;&quot;,&quot;content&quot;:&quot;&quot;}\" class=\"x-share\" title=\"Share on Facebook\" onclick=\"window.open('http:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Fhiwerk.site%2Fsponec%2Fen%2Fwp-json%2Fwp%2Fv2%2Fpages%2F6276%2F&amp;t=Wooden+house+in+Vienna', 'popupFacebook', 'width=650, height=270, resizable=0, toolbar=0, menubar=0, status=0, location=0, scrollbars=0'); return false;\"><i class=\"x-icon-facebook-square\" data-x-icon-b=\"&#xf082;\"><\/i><\/a><a href=\"#share\" data-x-element=\"extra\" data-x-params=\"{&quot;type&quot;:&quot;tooltip&quot;,&quot;trigger&quot;:&quot;hover&quot;,&quot;placement&quot;:&quot;bottom&quot;,&quot;title&quot;:&quot;&quot;,&quot;content&quot;:&quot;&quot;}\" class=\"x-share\" title=\"Share on LinkedIn\" onclick=\"window.open('http:\/\/www.linkedin.com\/shareArticle?mini=true&amp;url=https%3A%2F%2Fhiwerk.site%2Fsponec%2Fen%2Fwp-json%2Fwp%2Fv2%2Fpages%2F6276%2F&amp;title=Wooden+house+in+Vienna&amp;summary=%5Bvc_row%5D%5Bvc_column%5D%5Bvc_column_text%5D+Wooden+house+in+Vienna+%5B%2Fvc_column_text%5D%5B%2Fvc_column%5D%5B%2Fvc_row%5D%5Bvc_row%5D%5Bvc_column+width%3D%221%2F3%22%5D%5Bvc_column_text%5D+The+wooden+house+in+Vienna+is+one+of+our+most+difficult+completed+projects%2C+but+also+one+of+the+most+satisfying+as+a+final+result.+The+terrain+of+the+site+had+a+huge+vertical+drop%2C+without+the+possibility+for+access+of+equipment+and+therefore+all+the+work+such+as+removal+of+materials%2C+lifting+and+placement+was+done+manually.+%5B%2Fvc_column_text%5D%5B%2Fvc_column%5D%5Bvc_column+width%3D%222%2F3%22%5D%5Blayerslider_vc+id%3D%226%22%5D%5B%2Fvc_column%5D%5B%2Fvc_row%5D%5Bvc_row%5D%5Bvc_column+width%3D%221%2F2%22%5D%5Bvc_column_text%5D%5B%2Fvc_column_text%5D%5B%2Fvc_column%5D%5Bvc_column+width%3D%221%2F2%22%5D%5Bvc_column_text%5D+Basic+construction+and+finishing+works+Our+work+on+the+Vienna+house+included+the+overall+construction%2C+including+the+finishing+works.+We+managed+within+4+months+to+do+everything+that+was+required+of+us%2C+achieving+a+very+good+result+and+leaving+satisfied+customers.+The+house+consists+of+two+floors%2C+and+on+the+first+floor+are+located%3A+a+living+room%2C+a+kitchen%2C+a+study+and+a+bathroom+with+a+toilet.+On+the+second+floor+there+are+three+bedrooms%2C+a+wardrobe+room%2C+as+well+as+two+bathrooms+with+a+toilet.%5B%2Fvc_column_text%5D%5B%2Fvc_column%5D%5B%2Fvc_row%5D%5Bvc_row%5D%5Bvc_column+width%3D%221%2F2%22+el_class%3D%22vc_col-sm-push-6%22%5D%5Bvc_column_text%5D%5B%2Fvc_column_text%5D%5B%2Fvc_column%5D%5Bvc_column+width%3D%221%2F2%22+el_class%3D%22vc_col-sm-pull-6%22%5D%5Bvc_column_text%5D+Project+Information%3A+Total+floorage%3A+234+m2+1st+floor%3A+a+living+room%2C+a+study%2C+a+kitchen%2C+a+bathroom+with+a+toilet%3B+2nd+floor%3A+3+bedrooms%2C+wardrobe%2C+2+bathrooms+with+a+toilet.+Construction+technology+of+the+external+walls%3A+Eco+2+Year+of+construction%3A+2015+Construction+period%3A+4+months+%5B%2Fvc_column_text%5D%5B%2Fvc_column%5D%5B%2Fvc_row%5D%5Bvc_row+full_width%3D%22stretch_row_content_no_spaces%22%5D%5Bvc_column%5D%5Bvc_column_text%5D%5B%2Fvc_column_text%5D%5B%2Fvc_column%5D%5B%2Fvc_row%5D%5Bvc_row%5D%5Bvc_column%5D%5Bvc_column_text%5D+Check+out+other+completed+projects+%5B%2Fvc_column_text%5D%5B%2Fvc_column%5D%5B%2Fvc_row%5D%5Bvc_row%5D%5Bvc_column+width%3D%221%2F2%22%5D%5Bvc_column_text%5D+The+house+in+Tryavna+is+a+modern+one-storey+building+consisting+of+a+living+room+with+a+kitchen%2C+two+bedrooms%2C+two+bathrooms+with+a+toilet+and+an+entrance+hall.+Our+work+on+the+house+included+the+overall+construction%2C+as+well+as+the+external+walls%2C+which+are+built+according+to+ECO+2+technology.+The+complete+construction+took+us+3.5+months.+Wooden+house+in+Tryavna+%5B%2Fvc_column_text%5D%5B%2Fvc_column%5D%5Bvc_column+width%3D%221%2F2%22%5D%5Bvc_column_text%5D+The+prefabricated+eco+house+in+Ivanyane+is+a+practical+and+comfortable+family+house+on+two+floors%2C+built+in+2018-2019.+It+is+built+according+to+ECO+3+technology%2C+guaranteeing+warmth+and+low+heating+costs.+Prefabricated+house+in+Ivanyane+%5B%2Fvc_column_text%5D%5B%2Fvc_column%5D%5B%2Fvc_row%5D&amp;source=%D0%A1%D0%BF%D0%BE%D0%BD%D0%B5%D1%86+%D0%9E%D0%9E%D0%94', 'popupLinkedIn', 'width=610, height=480, resizable=0, toolbar=0, menubar=0, status=0, location=0, scrollbars=0'); return false;\"><i class=\"x-icon-linkedin-square\" data-x-icon-b=\"&#xf08c;\"><\/i><\/a><a href=\"#share\" data-x-element=\"extra\" data-x-params=\"{&quot;type&quot;:&quot;tooltip&quot;,&quot;trigger&quot;:&quot;hover&quot;,&quot;placement&quot;:&quot;bottom&quot;,&quot;title&quot;:&quot;&quot;,&quot;content&quot;:&quot;&quot;}\" class=\"x-share\" title=\"Share on Pinterest\" onclick=\"window.open('http:\/\/pinterest.com\/pin\/create\/button\/?url=https%3A%2F%2Fhiwerk.site%2Fsponec%2Fen%2Fwp-json%2Fwp%2Fv2%2Fpages%2F6276%2F&amp;media=&amp;description=Wooden+house+in+Vienna', 'popupPinterest', 'width=750, height=265, resizable=0, toolbar=0, menubar=0, status=0, location=0, scrollbars=0'); return false;\"><i class=\"x-icon-pinterest-square\" data-x-icon-b=\"&#xf0d3;\"><\/i><\/a><\/div><\/div>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]\n<h4 style=\"text-align: center;\">Check out other completed projects<\/h4>\n[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<img  class=\"x-img\"  src=\"https:\/\/hiwerk.site\/sponec\/wp-content\/uploads\/2019\/09\/kushta-tryavna-sponec.jpg\" alt=\"wooden house\">\n<p>The house in Tryavna is a modern one-storey building consisting of a living room with a kitchen, two bedrooms, two bathrooms with a toilet and an entrance hall. Our work on the house included the overall construction, as well as the external walls, which are built according to ECO 2 technology. The complete construction took us 3.5 months.<\/p>\n<h6><a href=\"https:\/\/hiwerk.site\/sponec\/en\/wooden-houses\/wooden-house-in-tryavna\/\">Wooden house in Tryavna<\/a><\/h6>\n[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<img  class=\"x-img\"  src=\"https:\/\/hiwerk.site\/sponec\/wp-content\/uploads\/2020\/08\/darveni-kashti.jpg\" alt=\"wooden house\">\n<p>The prefabricated eco house in Ivanyane is a practical and comfortable family house on two floors, built in 2018-2019. It is built according to ECO 3 technology, guaranteeing warmth and low heating costs.<\/p>\n<h6><a href=\"https:\/\/hiwerk.site\/sponec\/en\/wooden-houses\/prefabricated-house-in-bulgaria\/\">Prefabricated house in Ivanyane<\/a><\/h6>\n[\/vc_column_text][\/vc_column][\/vc_row]\n<\/section>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] Wooden house in Vienna [\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/3&#8243;][vc_column_text] The wooden house in Vienna is one of our most difficult completed projects, but also one of the most satisfying as a final result. The terrain of the site had a huge vertical drop, without the possibility for access of equipment and therefore all the work such as removal of materials, lifting and placement was done manually. [\/vc_column_text][\/vc_column][vc_column width=&#8221;2\/3&#8243;][layerslider_vc id=&#8221;6&#8243;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243;][vc_column_text][\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text] Basic construction and finishing works Our work on the Vienna house included the overall construction, including the finishing works. We managed within 4 months to do everything that was required of us, achieving a very good result and leaving satisfied customers. The house consists of two floors, and on the first floor are located: a living room, a kitchen, a study and a bathroom with a toilet. On the second floor there are three bedrooms, a wardrobe room, as well as two bathrooms with a toilet.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243; el_class=&#8221;vc_col-sm-push-6&#8243;][vc_column_text][\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243; el_class=&#8221;vc_col-sm-pull-6&#8243;][vc_column_text] Project Information: Total floorage: 234 m2 1st floor: a living room, a study, a kitchen, a bathroom with a toilet; 2nd floor: 3 bedrooms, wardrobe, 2 bathrooms with a toilet. Construction technology of the external walls: Eco 2 Year of construction: 2015 Construction period: 4 months [\/vc_column_text][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row_content_no_spaces&#8221;][vc_column][vc_column_text][\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text] Check out other completed projects [\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243;][vc_column_text] The house in Tryavna is a modern one-storey building consisting of a living room with a kitchen, two bedrooms, two bathrooms with a toilet and an entrance hall. Our work on the house included the overall construction, as well as the external walls, which are built according to ECO 2 technology. The complete construction took us 3.5 months. Wooden house in Tryavna [\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text] The prefabricated eco house in Ivanyane is a practical and comfortable family house on two floors, built in 2018-2019. It is built according to ECO 3 technology, guaranteeing warmth and low heating costs. Prefabricated house in Ivanyane [\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":6195,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"template-layout-full-width.php","meta":{"_mi_skip_tracking":false},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/hiwerk.site\/sponec\/en\/wp-json\/wp\/v2\/pages\/6276"}],"collection":[{"href":"https:\/\/hiwerk.site\/sponec\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/hiwerk.site\/sponec\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/hiwerk.site\/sponec\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hiwerk.site\/sponec\/en\/wp-json\/wp\/v2\/comments?post=6276"}],"version-history":[{"count":2,"href":"https:\/\/hiwerk.site\/sponec\/en\/wp-json\/wp\/v2\/pages\/6276\/revisions"}],"predecessor-version":[{"id":6278,"href":"https:\/\/hiwerk.site\/sponec\/en\/wp-json\/wp\/v2\/pages\/6276\/revisions\/6278"}],"up":[{"embeddable":true,"href":"https:\/\/hiwerk.site\/sponec\/en\/wp-json\/wp\/v2\/pages\/6195"}],"wp:attachment":[{"href":"https:\/\/hiwerk.site\/sponec\/en\/wp-json\/wp\/v2\/media?parent=6276"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}